Dec. 29 I'm starting on the left Wing. Most of the hardware work I completed while I worked on the right wing, such as trailing edges on the flap and aileron, and flap and aileron hinges. Today I drilled out the lightening holes on the gussets. 1 hour.
No comments:
Post a Comment